Monthly Archives: August 2014

Loomis Public Schools

Additions and Alterations to Loomis Public Schools
Loomis, Nebraska

Architectural services provided for the Loomis Public Schools included design, bid and construction administration for a 22,456 square foot addition which contained eight new classrooms, a media and computer center, science classrooms, and labs, new shop area, wrestling and weight room, along with new commons, storage and restroom facilities.

Construction Cost: $2,931,711
SF: 22,456

Design-Bid-Build
Joseph R. Hewgley / Mike Hinde

New North Platte Senior High School

New North Platte Senior High School
North Platte, Nebraska

The new senior high school project was one of the 28 separate projects Joseph R. Hewgley & Associates has provided for the North Platte Schools. In association with another firm, Joseph R. Hewgley & Associates was involved with all architectural services from pre-bond to construction to construction administration. The new 280,00 square foot high school was constructed for $30,325,000 and included three full-sized gymnasiums, 48 classrooms, science labs, computer resource, technology, performance auditorium, and student classroom areas.

Bridgeport Public Schools

Additions / Alterations to Bridgeport Public Schools
Bridgeport, Nebraska

With the recent passage of a bond for Bridgeport Public Schools, the proposed additions and remodel will include a new kindergarten, preschool, and additional 1st thru 6th grade classrooms. Also included will be a new theatre, new gymnasium, locker rooms, concessions, new entry and commons, wrestling deck, storage, and remodeled office and work areas.

Lincoln Elementary School

Gering Lincoln Elementary School
Gering, Nebraska

LEED GOLD Certified

Because of it’s design, the Lincoln Elementary School uses about half the energy that its sister elementary school currently uses. This LEED Gold certified school was contains 49,804 square feet of sustainable construction and use of recycled materials, indoor air quality management and efficient water, energy and natural lighting. The total finished construction cost was $7,075,129.00, which is only $142.00 per square foot.

Schuyler Public Schools

New Schuyler Kindergarten through Third Grade
Additions to High School Schuyler Public Schools
Schuyler, Nebraska

The new K-3 elementary included 57,775 square feet of new classrooms, offices, assembly area, media center, commons, lunch area, restrooms and new playground and parking. Additions and alterations to the high school included 8,600 square feet of additional classrooms, commons and restrooms.

Bid Cost: $ 6,787,430
SF: 66,375

Design-Bid-Build
Joseph R. Hewgley/Ryan Stearns/Mike Hinde

Shelton Public Schools

Additions / Alterations to Shelton Public Schools
Shelton, Nebraska

The 17,973 square foot Shelton Schools project includes additions and alterations to a new competition gymnasium, two new cross courts for extra practice, new commons and concessions, men and women’s restrooms, and much needed storage space. The renovations includes central office and work areas. Construction started in March of 2014.

Bond Cost: $3,400,000
SF: 17,973

Design-Construction Management
Joseph R. Hewgley/ Mike Hinde

North Platte Senior High School

New North Platte Senior High School
North Platte, Nebraska

The new senior high school project was one of the 28 separate projects Joseph R. Hewgley & Associates has provided for the North Platte Schools. In association with another firm, Joseph R. Hewgley & Associates was involved with all architectural services from pre-bond to construction to construction administration. The new 280,00 square foot high school was constructed for $30,325,000 and included three full-sized gymnasiums, 48 classrooms, science labs, computer resource, technology, performance auditorium and student classroom areas.

Cost: $30,325,000.00
SF: 280,00

Design-Bid-Build
Joseph R. Hewgley / Ryan Stearns

Ponca Public Schools

Additions / Alterations to Ponca Public Schools
Ponca, Nebraska

Additions and Alterations to Ponca Public Schools in Ponca, Nebraska. The new 71,725 square foot additions and alterations includes additional much needed classroom space, new library, media center, computer labs, teacher work areas, offices, conference, kitchen prep and serving area, large gathering space for commons and cafeteria, locker room, and gymnasium.

Bid Cost: $ 10,000,000

SF: 71,725
Design-Bid-Build
Joseph R. Hewgley/Ryan Stearns Mike Hinde

Bridgeport Public Schools

Additions / Alterations School
Bridgeport, Nebraska

With the recent passage of the bond for Bridgeport Public Schools, the proposed additions and remodel will include a new kindergarten, preschool, and additional 1st thru 6th grade classrooms.  Also included will be a new theatre, new gymnasium, locker rooms, concessions, new entry and commons, wrestling deck, storage, and remodeled office and work areas.

Estimate Cost: $ 9,500,000
SF: 67,407

Design-Construction Management
Joseph R. Hewgley / Ryan Stearns

Gering Lincoln Elementary School

Gering, Nebraska
LEED GOLD Certified

Because of it’s design, the Lincoln Elementary School uses about half the energy that its sister elementary school currently uses. This LEED Gold certified school was contains 49,804 square foot of sustainable construction and use of recycled materials, indoor air quality management and efficient water, energy and natural lighting. The total finished construction cost was $7,075,129.00 which is only $142.00 per square foot.

Cost: $7,075,129.00 ($142/SF)
SF: 49,804

Design-Bid-Build
Joseph R. Hewgley / Ryan Stearns